Skip to main content
أطوار الحلول للمقاولات العامة — Atwar Al Holoul Contracting Est.
HomeProjects
Track Record

Completed and ongoing projects

A sample of our scope across the Kingdom's regions, illustrated with technical diagrams of the actual scope of work.

Foundation Void Treatment — Al Hammadi Main HospitalCompleted
Soil Injection & Treatment

Foundation Void Treatment — Al Hammadi Main Hospital

Surveying and treating all surface and subsurface voids and cavities beneath the foundation level, through field, mechanical, and geophysical investigation, with a grouting network covering the full site.

Al Hammadi Main Hospital — Al Olaya, Riyadh
RiyadhGrouting network across 10,000m²
Foundation Void Treatment — Nexus ProjectCompleted
Soil Injection & Treatment

Foundation Void Treatment — Nexus Project

Treating weak zones and dissolution voids beneath the foundation level, following comprehensive field, mechanical, and geophysical investigation of the site.

Nexus Project — Phase 3, Al Ghadeer District
RiyadhFull grouting network for Phase 3
Foundation Void Treatment — Clock Tower ProjectCompleted
Soil Injection & Treatment

Foundation Void Treatment — Clock Tower Project

Injecting and treating soil and surface/subsurface voids, following comprehensive field, mechanical, and geophysical investigation of the site.

Clock Tower Project — Al Mashareo Al Oula Group
RiyadhGrouting network across ~3,200m²
Weak-Zone Injection Treatment — Al Ta'awun ParkCompleted
Soil Injection & Treatment

Weak-Zone Injection Treatment — Al Ta'awun Park

Injection works to treat weak zones and voids beneath the site surface, with injection pressure monitored in real time at every point.

Al Ta'awun Park
RiyadhLocalized grouting treatment
Soil Injection & Treatment for a Residential-Commercial ComplexCompleted
Soil Injection & Treatment

Soil Injection & Treatment for a Residential-Commercial Complex

Injecting and treating soil and surface/subsurface voids, following comprehensive field, mechanical, and geophysical site investigation.

Al Obeikan Real Estate Development
RiyadhGrouting network across ~40,000m²
Rock Fragmentation Along a Road AlignmentCompleted
Non-Explosive Rock Fragmentation

Rock Fragmentation Along a Road Alignment

Fragmenting igneous rock using non-explosive chemical agents along the road alignment, to facilitate excavation and site preparation.

Mahbas Al-Jinn Land Grant Scheme, Makkah
Makkah & Jeddah60,000m³ over 6 months
Shotcrete & Rock Slope StabilizationCompleted
Non-Explosive Rock Fragmentation

Shotcrete & Rock Slope Stabilization

Applying shotcrete and stabilizing rock slopes to protect the alignment and improve the stability of the terrain surrounding the road.

Mahbas Al-Jinn Land Grant Scheme, Makkah
Makkah & Jeddah~10,000m² treated
Rock Fragmentation Alongside a Live PipelineCompleted
Non-Explosive Rock Fragmentation

Rock Fragmentation Alongside a Live Pipeline

Fragmenting rock along the alignment of an operating pipeline, in full coordination with the facility's operational safety requirements.

East-West Line — Saudi Aramco
Eastern ProvinceRock fragmentation alongside the pipeline
Asphalt Paving Within a Sewerage Network ProjectCompleted
Asphalt & Road Works

Asphalt Paving Within a Sewerage Network Project

Executing asphalt paving layers as part of rehabilitation works following sewerage network installation, preparing routes to approved specifications.

Sewerage Network Completion Contract, Al Dawadmi Governorate
RiyadhPhases 4 and 5
Rock Fragmentation Within Sewerage Network RoutesCompleted
Non-Explosive Rock Fragmentation

Rock Fragmentation Within Sewerage Network Routes

Perforation and rock fragmentation works along the sewerage network routes, supporting excavation and pipe-laying in areas of hard rock formations.

Sewerage Network Completion Contract, Al Dawadmi Governorate
RiyadhPhases 4 and 5
Before / After

Measurable results, not marketing promises

Soil Injection & Treatment

After
Before

Non-Explosive Rock Fragmentation

After
Before
Our Footprint in the Kingdom

Mobile execution crews across seven regions

We mobilize crews and equipment directly to site anywhere in the Kingdom, with permanent operating bases in Riyadh and the Eastern Province.

Riyadh

Permanent operating base

14

Eastern Province

Permanent operating base

11

Makkah & Jeddah

07

Madinah

03

Tabuk & NEOM

04

Asir & Abha

02

Qassim

03
Illustrative Gallery

Scope-of-work diagrams by service

Have a site with ground settlement or a rock problem that needs an engineered fix?

Send us the site details and we'll respond within one business day with an initial assessment and proposed next steps.